ANALISIS PEMASANGAN BOX CULVERT (2 m x 1.5 m) SEBAGAI SALURAN PENYEIMBANG DI KM 54+490 SAMPAI DENGAN KM 55+070

Authors

  • Dicky Arisikam PT Kereta Api Indonesia (Persero)
  • Heru Kuswanto PT KAI
  • Muhammad Arifudin PT KAI
  • Felix Joel Ledowikj PT KAI

DOI:

https://doi.org/10.33197/jitter.vol9.iss2.2023.1075

Keywords:

box culvert, flood, train

Abstract

Train is one of the land transportation
infrastructure that have an important role in
distributing things and passengers. However,
currently there are still some obstacles in the
operation of the railway, mainly caused by natural
disasters. In general, the National Disaster
Management Agency (BNPB) noted that 95% of
disasters that occurred in Indonesia were dominated
by hydrometeorological disasters, one of which was
flooding.
In February 2021, there was a flood on the
railway line, precisely between Lemahabang -
Kedunggedeh Station, DAOP 1 Jakarta on the rail
line KM54+490 to KM 55+070 which caused the
body of the upstream and downstream rail lines
collapse, resulting in the cessation of the train
operations.
Therefore, a total of 31 box culverts will be
planned to drain the 5-year flood discharge and
become a balancing channel for the railroad if the
flood phenomenon occurs again

Downloads

Download data is not yet available.

Published

2023-04-15

How to Cite

[1]
D. Arisikam, H. Kuswanto, M. Arifudin, and F. J. Ledowikj, “ANALISIS PEMASANGAN BOX CULVERT (2 m x 1.5 m) SEBAGAI SALURAN PENYEIMBANG DI KM 54+490 SAMPAI DENGAN KM 55+070”, JITTER, vol. 9, no. 2, Apr. 2023.

Issue

Section

Articles

Most read articles by the same author(s)

1 2 > >>