Abstract

The gap between increasing demand and limited supply is due to government policies that regulate the purchase and storage of subsidized LPG. This condition requires distribution agents to have an inventory management system that is able to adjust needs appropriately and sustainably. PT Wira Citra Agung Mandiri as a 3KG LPG distribution agent in Bandung Regency is experiencing problems in stock management and product distribution. Symptoms of problems that arise are characterized by frequent shortages of inventory at the base and shop level when demand increases, as well as excess stock in certain periods. This condition occurs because the inventory management implemented is still reactive and not yet supported by a structured and integrated distribution planning system, thus having an impact on logistics efficiency and service quality to consumers. This research aims to describe the implementation of ongoing logistics management and evaluate the usefulness of the Distribution Requirements Planning (DRP) model as an alternative distribution planning system in optimizing 3KG LPG supplies. The research method used is quantitative descriptive with analysis units of agents, bases and stalls which are members of the company's distribution network. Data was analyzed by comparing the Lot for Lot and Distribution Requirements Planning (DRP) methods in inventory management. The research results show that the application of DRP is able to produce distribution planning that is more systematic, coordinated and efficient than the Lot for Lot method. Apart from that, DRP has been proven to be able to reduce total inventory costs and overcome stock shortage problems significantly. Therefore, the implementation of DRP is recommended to be implemented comprehensively at PT Wira Citra Agung Mandiri in order to increase distribution efficiency and operational sustainability of 3KG LPG.

References

Aldiansyah, F., & Nurhidayat, A. E. (2022). Pengoptimalisasi Sistem Distribusi Pesanan Buku Paket dengan Metode DRP & Tabu Search. Jurnal Indonesia Sosial Sains, 3(09), 1263–1277. https://doi.org/10.59141/jiss.v3i09.662

Aulia, M. A., Fajhriana, L. S., Aziz, F., & Fauzi, M. (2022). Perencanaan Distribusi Produk Gas PT Rebbak Trolih Lestari menggunakan Metode Distribustion Requirement Planning (DRP). Jurnal Bayesian : Jurnal Ilmiah Statistika Dan Ekonometrika, 2(1), 1–14. https://doi.org/10.46306/bay.v2i1.12

Diwani, J. A., Sriwana, I. K., & Novitasari, N. (2025). PERENCANAAN PENJADWALAN AKTIVITAS DISTRIBUSI KOMODITAS KEDELAI PADA CV XYZ MENGGUNAKAN METODE DISTRIBUTION REQUIREMENT PLANNING (DRP). Jurnal Teknologi Industri Pertanian, 35(1), 23–30. https://doi.org/10.24961/j.tek.ind.pert.2025.35.1.23

Fauzan, M. P. B., Rohendi, D., & Larutama, W. (2025). Identifikasi Waste Melalui Pendekatan Lean Logistics Pada Aktivitas Distribusi Material PT XYZ. Jurnal Teknik Industri Terintegrasi, 8(3), 2866–2871. https://doi.org/10.31004/jutin.v8i3.47047

Ningrat, N. K., & Aristriyana, E. (2023). Penerapan Metode Distribution Requirement Planning (DRP) dalam Penjadwalan Distribusi Produk di UKM SB Jaya Ciamis. Jurnal Industrial Galuh, 5(2), 92–105. https://doi.org/10.25157/jig.v5i2.3308

Pradana, H. A., Wahyuningsih, S., Novita, E., Humayro, A., & Purnomo, B. H. (2019). Identifikasi Kualitas Air dan Beban Pencemaran Sungai Bedadung di Intake Instalasi Pengolahan Air PDAM Kabupaten Jember. JURNAL KESEHATAN LINGKUNGAN INDONESIA, 18(2), 135. https://doi.org/10.14710/jkli.18.2.135-143

Ptak, C., & Smith, C. (with Industrial Press). (2019). Demand driven material requirements planning (DDMRP): Version 3. Industrial Press.

Suwanruji, P., & Enns, S. (2000). Distribution Planning and Control: An Experimental Comparison of DRP and Order Point Replenishment Strategies. Conference Proceeding of The Academy Business and Administrative Sciences.

Tersine, R. J. (1984). Principles of inventory and materials management (2. ed., 4. impr). North-Holland.

Vollmann, T. E., Berry, W. L., & Whybark, D. C. (1988). Manufacturing planning and control systems (2. ed). Irwin.

Published

2026-07-31

How to Cite

Avinas, V., & Rochman, D. D. (2026). Implementation of Distribution Requirement Planning (DRP) at PT Wira Citra Agung Mandiri. Jurnal Logic: Logistics & Supply Chain Center, 5(1), 1–8. https://doi.org/10.33197/jlscc.v5i1.3458