Arisikam, D., Purwadinata, A. H. and Ash Shiddiq, R. H. B. (2021) “DETERMINATION OF CRASH DURATION USING LINEAR PROGRAM METHOD FOR BOX CULVERT CONSTRUCTION PROJECT NO 409 ON TRAIN LINE IN DAOP 3 CIREBON”, Jurnal Ilmiah Teknologi Infomasi Terapan (JITTER), 8(1), pp. 106–110. doi: 10.33197/jitter.vol8.iss1.2021.729.