[1]
Arisikam, D., Purwadinata, A.H. and Ash Shiddiq, R.H.B. 2021. DETERMINATION OF CRASH DURATION USING LINEAR PROGRAM METHOD FOR BOX CULVERT CONSTRUCTION PROJECT NO 409 ON TRAIN LINE IN DAOP 3 CIREBON. Jurnal Ilmiah Teknologi Infomasi Terapan. 8, 1 (Dec. 2021), 106–110. DOI:https://doi.org/10.33197/jitter.vol8.iss1.2021.729.